Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Published by Scroll Versions from space DEV and version r097

...

  1. From the Home page, select the required template.For more information, see Home Page.

    Info

    NOTE: If you want to use a blank flow, you can select the Create a new flow option. For more information, see Create Flow Page.

  2. A new flow is created, with the Template Name  - X, where:
    1. Template Name is the name of the template you have selected
    2. X is a number. 

      Tip

      Tip: Click the Template Name  - X,  to enter a flow name and description.

  3. Review the guidelines to populate each placeholder in the template. A template has been specified when you have configured one instance of each of the following:
    1. Dataset: Click the Dataset placeholder to select a dataset to import. For more information, see Import Data Page.
    2. Recipe: After you import a dataset, an empty recipe is created for you. To build your recipe, click the recipe placeholder. For more information, see Transformer Page.
    3. Output: Click the output placeholder. Specify the file or table output to which results are written.

      Info

      NOTE: In some cases, an output placeholder may not be available in the template. You may need to create the output object.

      For more information, see Create Outputs.

      The Create Output dialog box is displayed.

      D caption
      Create Output dialog
      1. Select the required loading option. For more information, see Loading Options below.
      2. Then, select objects from the available drop-downs to specify the table that you are loading.  
      3. To add the output, click Save.
      4. The output is saved in the selected destination.
  4. When finished, the specified objects are displayed in the flow . For more information, see in Flow View Page.
  5. To run a job, select the output object, and click Run. For more information, see Run Job Page 
  6. Configure the job in the Run Job page. Click Run again.

Loading Options

The following options are available for loading a table:

  • Create a new table: For each job run, a new table is created with the same base name in the selected publishing destination.
  • Replace data only (Truncate): For each job run, all data in the table is truncated and replaced with any new results.
  • Append to tableFor each job run,  new results are added to the end of the table.
  • Drop the tableWith each run, the table is dropped (deleted). A new table with the same name is created, and any new results are added to it.

D s also
inCQLtrue
label((label = "project_management_tasks"flow_ui") OR (label = "template"))